As Altyapı Zemin İyileştirme A.Ş., our main goal is to complete the works in the projects we take part in a qualified, fast and high-quality manner. With over 30 years of experience, we develop flexible, field-appropriate and technical solutions that keep the project on schedule and optimize costs.

Our main fields of activity:

  • Reinforced bored pile works for bridges, viaducts, under/overpasses, grade-separated junctions, deep excavations and top-down cut-and-cover works; piled retaining and shoring walls with anchors, soil nails and/or SN-PG-IBO bolt-supported piles; and slope support and landslide projects in all soil types.
  • Soil improvement and strengthening solutions: Deep Soil Mixing (DSM) works, plastic piles, CFA piles, wick drain installation and geotechnical design applications.
  • Contact and consolidation grouting in all soil types, void-filling grouting in karstic formations and sinkholes, in-tunnel and above-tunnel contact and consolidation grouting works, and geotechnical design projects.
See All
Bina içi mini kazık ve enjeksiyon çalışması

Reference Projects

Northern Marmara Motorway

Northern Marmara Motorway

2017 – 2019

A large-scale project comprising viaduct and slope bored piles together with in-tunnel strengthening injection applications.

Salihli – Eşme HSR Works

Salihli – Eşme HSR Works

2022 – 2025

Viaduct and slope support works together with soil improvement applications carried out within the scope of the High-Speed Railway line.

Black Sea Coastal Highway

Black Sea Coastal Highway

2005 – 2012

A project carried out within the scope of drilling works for engineering structures, tunnels and landslide areas between Giresun and Hopa.

ALL PROJECTS

Our Solutions

GROUND IMPROVEMENT

Deep Soil Mixing (DSM)

Deep soil mixing (DSM) is a ground improvement method that increases bearing capacity and reduces settlement by mixing weak soils in place with a cement-based binder to form soil–cement columns. Production data for every column is recorded by datalogger and flowmeter; column quality is verified by coring and load tests.

Derin Zemin Karıştırma (DSM)

DEEP FOUNDATIONS

Deep Foundations (CFA, Bored Piles)

Bored pile and CFA pile systems carry structural loads through weak surface layers down to competent soil and rock. Production data is monitored by the rig's on-board recording system; pile integrity and bearing capacity are checked by PIT and load tests.

Derin Temeller (CFA, Forekazık)

GROUTING

Grouting Applications

Grouting is the injection of cement-based mixes under pressure into soil or rock to fill voids, reduce permeability and increase strength. Mixes are prepared in calibrated automatic plants; pressure and grout take are recorded at every stage by pressure gauges and flowmeters at the borehole.

Enjeksiyon Uygulamaları

FOUNDATION STRENGTHENING

Indoor Micropile / Grouting Solutions

In structures with settlement problems or increased loads, foundations are strengthened with micropiles and under-foundation grouting installed from inside the building using compact drilling equipment. Grouting pressure and volume are measured at the borehole; pile capacity is verified by load tests and the behaviour of the structure is monitored throughout the works.

Bina İçi Mini Kazık / Enjeksiyon Çözümleri

INVESTIGATION AND DESIGN

Site Investigation, Engineering and Design

The soil profile and design parameters are determined and reported through drilling, field and laboratory tests. Deep foundation, shoring and ground improvement designs are developed with constructability, cost and programme in mind, drawing on our field experience.

Zemin Etüdü, Projelendirme ve Tasarım

CONSULTANCY AND TESTING

Geotechnical Consultancy & Field Testing

We provide geotechnical consultancy to owners and contractors, from method selection through to supervision of the works. Pile load, pile integrity (PIT), anchor pull-out and plate load tests are carried out; excavation and structural behaviour are monitored with inclinometer and piezometer readings.

Geoteknik Müşavirlik & Saha Testleri

News

November 2026

Our Grouting Machinery Park Expands with 3 New Rigs

Three rigs have been added to our grouting machinery park: two ES400 units and one Swedish-made Diamec 262. Capable of site investigation drilling and inclined grout hole drilling, these rigs provide flexible operation under different site conditions.

October 2026

Mobilization Completed for the Durrës Yacht Marina Project

The mobilization process for the Durrës Yacht Marina Project in Albania has been completed. Customs and transport procedures for the machinery and equipment have been finalized and the shipment to site has been carried out; site setup works are ongoing.

September 2026

Phase 2 at the Elmadağ Railway Bridges: Ground Improvement Works with Plastic Pile Installation Begin

In the second phase of the Elmadağ Railway Bridges Project, ground improvement works with plastic pile installation are starting beneath the bridge foundations. The second-phase works have been planned in line with the site experience gained in the first phase.

August 2026

DSM (Deep Soil Mixing) Works Continue on the Delice–Sungurlu–Çorum HSR Project

Within the scope of the Delice–Sungurlu–Çorum High-Speed Railway Project, Deep Soil Mixing (DSM) works are continuing in order to increase the bearing capacity of the ground beneath the railway embankment. The works are being carried out in accordance with the project specification and the work schedule.

July 2026

Our Temelli Malıköy Machinery Depot Is Now in Operation

Our machinery depot in Temelli Malıköy, Ankara, has gone into operation. With the fill and drainage works completed across the site, the area is now ready for the safe storage of machinery and equipment. The depot will serve as the maintenance and dispatch center of our machinery park.

June 2026

Our Ground Improvement and Deep Foundation Capacity Increased with the BAUER BG 30 V

To increase our capacity in ground improvement and deep foundation works, a BAUER BG 30 V drilling rig has been added to our machinery park. Capable of applying the DSM, bored pile and CFA methods, the rig has started production on our site with a Eurodrill RHP 15 DSM rotary head.

May 2026

Quality Control in DSM Works: PIT, Coring and Load Tests

The quality of our DSM works is controlled by tests carried out on site. Column continuity is verified by PIT testing, material strength by core samples, and bearing capacity by load tests.

April 2026

At the Center of Next-Generation Ground Technologies: Bauer In-House Exhibition

Our company attended the Bauer In-House Exhibition held in Germany. At the event, next-generation bored pile and ground improvement equipment, led by the BG 50, was examined and technical meetings were held with the manufacturer's engineering team.

February 2026

Our Technical Team Registered with the Chartered Engineer (CEng) Title

Sinan Ekin Durmuş from our team has been registered by the Engineering Council through his membership of the Institution of Civil Engineers (ICE) and awarded the title of Chartered Engineer. This internationally recognized title certifies our engineering competence through an independent institution.

Headquarters – Trabzon Office

Gazi Paşa Mah. Zeytin Sk. No: 3 Floor: 3 Suite: 7
TRABZON - TÜRKİYE
Phone: 0462 400 04 61

Ankara Office

Gölgeli Sokak No:17/4 G.O.P Çankaya
ANKARA - TÜRKİYE
Phone: 0312 310 04 61

Copyright © 2026 Altyapı Zemin İyileştirme İnşaat ve Müşavirlik A.Ş