Altyapı Zemin İyileştirme İnşaat ve Müşavirlik A.Ş
Piles for five viaducts were constructed with the BG 34 H rig. Backfill (contact) grouting was applied for in-tunnel support. Piling works were also carried out within the slope works along the motorway.
Employer:
Cengiz İnşaat Sanayi ve Ticaret A.Ş. / Limak İnşaat Sanayi ve Ticaret A.Ş.
Project Name:
Northern Marmara Motorway
Location:
İstanbul, Türkiye
Year:
2018 – 2020
Equipment Used:
Gazi Paşa Mah. Zeytin Sk. No: 3 Floor: 3 Suite: 7
TRABZON - TÜRKİYE
Phone: 0462 400 04 61
Gölgeli Sokak No:17/4 G.O.P Çankaya
ANKARA - TÜRKİYE
Phone: 0312 310 04 61
Copyright © 2026 Altyapı Zemin İyileştirme İnşaat ve Müşavirlik A.Ş