Altyapı Zemin İyileştirme İnşaat ve Müşavirlik A.Ş
Deep soil mixing was applied to prevent liquefaction-induced settlements that could occur in a possible earthquake. Plastic piles were used in stiff soils where the deep mixing method could not work efficiently. Within the tunnel support works, in-tunnel and above-tunnel grouting was performed with electric and crawler drilling rigs. Bored piles were constructed at the foundations of the balanced-cantilever and other viaducts at Eşme.
Employer:
Kolin İnşaat Turizm Sanayi ve Ticaret A.Ş.
Project Name:
Salihli – Eşme HSR Works
Location:
Manisa – Uşak, Türkiye
Year:
2022 – 2025
Equipment Used: