Altyapı Zemin İyileştirme İnşaat ve Müşavirlik A.Ş
At Altyapı Zemin İyileştirme A.Ş., we continue to successfully complete bored pile works in many civil engineering applications. Our bored pile solutions can be grouped under the following headings.
Rotary bored piling is carried out using an auger and a temporary casing to drill to the required depth. The casing supports the pile bore until the required depth is reached. The auger is then removed, the reinforcement is placed and the concrete is poured in place.
Cased bored piles are particularly suitable for use in stiff soils, since they are generally larger in diameter than CFA piles and can overcome difficult ground obstructions. As they produce less noise and vibration than driven piles, they are also ideal for sites in built-up areas.
Plastic piles are constructed using an auger or bags attached to the rig. Concrete is placed through tremie pipes. The works are carried out to the diameter and length specified in the project. Daily production increases when concrete is supplied to site regularly.
The purpose of plastic piles is to transfer surface loads to competent ground. Plastic piles are built without reinforcement, and casing may be driven depending on the soil profile and the groundwater level.
Gazi Paşa Mah. Zeytin Sk. No: 3 Floor: 3 Suite: 7
TRABZON - TÜRKİYE
Phone: 0462 400 04 61
Gölgeli Sokak No:17/4 G.O.P Çankaya
ANKARA - TÜRKİYE
Phone: 0312 310 04 61
Copyright © 2026 Altyapı Zemin İyileştirme İnşaat ve Müşavirlik A.Ş