In the Kayseri Anafartalar – City Hospital – HSR Station Tram Line Project, bored piles for the shoring systems of the city-centre underpass were completed with 2 piling rigs and a 60-ton crawler crane.

Employer:

Kolin İnşaat Turizm Sanayi ve Ticaret A.Ş.

Project Name:

Kayseri Anafartalar – City Hospital – HSR Station Tram Line Project

Location:

Kayseri, Türkiye

Year:

2021 – 2022

Technique:

Shoring Piles – Secant Piles – Bored Piles

Equipment Used:

  • BAUER BG 34 H
  • BG 18 H
  • SANY SR 285 R
  • SANY 60-ton Crawler Crane

Other Projects

Delice – Çorum HSR Project

Delice – Çorum HSR Project

2025 – 2026

80 cm diameter DSM columns were constructed at embankment foundations and bridge approaches of the high-standard railway project.

Elmadağ Railway Bridges

Elmadağ Railway Bridges

2025 – 2026

Ground improvement works with plastic piles and PIT tests were completed at the railway bridges on the Ankara–Kırıkkale highway.

Haydarpaşa Station Restoration

Haydarpaşa Station Restoration

2025 – 2026

Compaction grouting works were successfully completed within the station's restoration to prevent liquefaction.

Adana Kozan Landslide Piles

Adana Kozan Landslide Piles

2025

Cased and reinforced bored pile works were completed to remediate the landslide on the Kozan–Feke–Saimbeyli highway.

Salihli – Eşme HSR Works

Salihli – Eşme HSR Works

2022 – 2025

Viaduct and slope support works together with ground improvement applications carried out within the High-Speed Railway line.

Kapıkule HSR Project

Kapıkule HSR Project

2024 – 2025

Deep soil mixing (DSM) ground improvement works were completed within the Kapıkule HSR project.

Hatay Airport Road

Hatay Airport Road

2024 – 2025

Deep soil mixing (DSM) works and field tests (coring, PIT) were completed on the airport road project.

Biga İÇDAŞ Aksaz Shipyard

Biga İÇDAŞ Aksaz Shipyard

2023

The deep foundation and retaining piles of the berthing quay were completed within the shipyard construction.

Sakarya ASAŞ Aluminium Plant

Sakarya ASAŞ Aluminium Plant

2022

Deep soil mixing (DSM) works complying with the specifications were completed within the factory construction.

Irmak – Zonguldak Railway

Irmak – Zonguldak Railway

2020 – 2021

Overlapping soil mix application and quality control works within the renewal of the railway bridge and the realignment of the line.

Northern Marmara Motorway

Northern Marmara Motorway

2017 – 2019

A large-scale project comprising viaduct and slope bored piles together with in-tunnel strengthening grouting applications.

Trabzon – Erzurum (Aşkale) Motorway

Trabzon – Erzurum (Aşkale) Motorway

2015 – 2018

Piling applications within tunnel grouting works at Maçka and Torul and viaduct slope support works.

Yeniköprü Yüksekova Bridge

Yeniköprü Yüksekova Bridge

2018

Foundation piles of the bridges and viaducts were completed on the Hakkari Yüksekova–Yeniköprü connection road.

Adana Çukurova Airport

Adana Çukurova Airport

2016

Wick drain (PVD) applications were carried out at the regional airport project to accelerate time-dependent settlements.

Black Sea Coastal Highway

Black Sea Coastal Highway

2005 – 2012

A project carried out within the scope of drilling works for engineering structures, tunnels and landslide areas between Giresun and Hopa.

Headquarters – Trabzon Office

Gazi Paşa Mah. Zeytin Sk. No: 3 Floor: 3 Suite: 7
TRABZON - TÜRKİYE
Phone: 0462 400 04 61

Ankara Office

Gölgeli Sokak No:17/4 G.O.P Çankaya
ANKARA - TÜRKİYE
Phone: 0312 310 04 61

Copyright © 2026 Altyapı Zemin İyileştirme İnşaat ve Müşavirlik A.Ş