Altyapı Zemin İyileştirme İnşaat ve Müşavirlik A.Ş
Grouting applications were carried out in the tunnels at Maçka and Torul. Approximately 6,000 metres of piling was performed within viaduct and slope support works.
Employer:
Cengiz İnşaat Sanayi ve Ticaret A.Ş.
Project Name:
Trabzon – Erzurum (Aşkale) Motorway
Location:
Trabzon – Erzurum, Türkiye
Year:
2015 – 2018
Equipment Used:
Gazi Paşa Mah. Zeytin Sk. No: 3 Floor: 3 Suite: 7
TRABZON - TÜRKİYE
Phone: 0462 400 04 61
Gölgeli Sokak No:17/4 G.O.P Çankaya
ANKARA - TÜRKİYE
Phone: 0312 310 04 61
Copyright © 2026 Altyapı Zemin İyileştirme İnşaat ve Müşavirlik A.Ş